Revamps of Refineries Process Column no. 51

The replacement of the new Column composed of the following activities:

  • Termination and disconnection of column systems.
  • Dismantling existing column.
  • Prefabrication and installation of structure platforms and elements.
  • Piping spools prefabrication of a wide range of materials including testing.
  • Insulation works covering procurement, fabrication and installation.
  • Positioning and installation of column.
  • Piping spool installation works.
  • Piping Tie-in works.