Israeli Electric Conmpany

Piping works.
power stations: Gezer and Alon Tavor.
Manufacturing of C.S piping and stainless steel piping in the sewage water system for turbine cooling in a joint cycle.
The manufacturing was executed using elements that were prepared in advance in our warehouse  and then assembled on site, under the Electric Company’s quality control.