Zomet Energy

1.  Erection, fabrication and certification of four (4) storage tanks in a total volume of 15,000 cubic meter.

Project duration was six (6) months.

2.  Installation of three (3) modular Mitsubishi FT 4,000 units, as part of the new power plant establishment.

Each unit is composed of two Turbines and a generator of a 140 MW power, a total load of 400 MW.

Scope of work: Installation of all static and rotated equipment, Turbine enclosures (Center line and BOP), all piping segments, steel and structure ducts and exhaust. 

Duration of the project 12 months.