Part of the Terminal`s is dispose and store the condensate by Truck Loading system and a Storage Tank.
Scope of work included: Process and firefighting piping fabrication and installation, skids and equipment installation, pipe racks and structure fabrication and installation, fabrication and installation a firefighting storage tank.
In addition the scope covered procurement and certification services associated with the firefighting works.